open
🕗 opening times
Monday | open 24 hours | |||||
Tuesday | open 24 hours | |||||
Wednesday | open 24 hours | |||||
Thursday | open 24 hours | |||||
Friday | open 24 hours | |||||
Saturday | open 24 hours | |||||
Sunday | open 24 hours |
Triq Il - Ferrovija, Santa Venera, MT Malta
contacts phone: +356 2123 4710
website: www.mita.gov.mt
larger map & directionsLatitude: 35.892316, Longitude: 14.4816756
Massimo Rucci
:: TOGGLE NAVIGATION Inside MITA Data Centre   Inside MITA Data Centre    We invested in MITA Data Centre because of... growing hosting requirements to satisfy the myriad of ICT solutions procured across Government and planned to be procured over the next decade the need to maximise levels of availability to offer 24x7 services need to operate in a ‘greener’ fashion increased physical security and business continuity requirements need to be able to adopt new technologies for economies of scale and efficiency A capital investment of €7m has been directed towards MITA Data Centre, out of which €6m investment was spent on works and services including the provision of architectural services mechanical and electrical engineering services project management services gutting services civil building and engineering works building services and finishing works data cabling and cabinets  UPS systems fire suppressions systems HVAC systems stand-by generator sets photovoltaic plant industrial steel support structure office furniture …Scalable, flexible, resilient, secure, powerful, and green 1,600 sqm of Technical space for dedicated computer rooms 4 segmented computer rooms 100 racks scalable up to 160 racks Designed to Tier III site classification 24x365 manned security and CCTV surveillance Access control based on biometrics and card combination Fire protection and suppression throughout all Data Centre and Support Facilities 2 x 1.6MW in-house substations and 2 x 1MW onsite backup generator capacity 400kW UPS capacity Autonomy of 72 hours Full system monitoring and automated change-over switching Truly redundant dual power feeds to all racks Closed control AC units for an optimum operating environment at 24 degrees with 50% humidity 24 x 365 temperature monitoring Direct connectivity from 3 Telcos and diverse routing with multiple ducting 2 independent in-house communication rooms 70,000m copper cabling and 8,000m fibre cabling within data centre Building Monitoring System to facilitate shutdowns of unnecessary use of equipment and systems Comprehensive Energy Monitoring System to lock power consumption by the hour down to rack level 20kW Photovoltaic Plan Solar water heating systems   ​​ ​​​        Inside MITA Data Centre Environmental measures Awards and memberships Appraisals Photos and videos
Cedric Mallia
::The Government of Malta ICT Agency
Joseph Buhagiar
::Sol Huebner
::